Energy Law
: Energy Legal BlogERCOT Identifies Scenarios for Texas Wind Transmission
By Amanda Frazier
Texas Senate Bill 20 (2005) directed the Public Utility Commission of Texas (PUCT), in consultation with the Electric Reliability Council of Texas (ERCOT) and the Southwest Power Pool (SPP), to designate Competitive Renewable Energy Zones (CREZ) and develop transmission plans for areas in Texas with significant renewable resource potential and developer commitment to facilitate new electricity generation from renewable resources. In July 2007 the PUCT designated five CREZs in West Texas and the Texas Panhandle. In early April ERCOT filed its transmission study, which provides transmission plans and cost estimates for the four scenarios that the PUCT designated. The study presents optimized transmission plans for developing between 12,000 MW and 24,000 MW of wind generation in the CREZs.
ERCOT applied three overarching criteria to its evaluation of the study scenarios: 1) system reliability, 2) sufficient transfer capability, and 3) benefit and cost-effectiveness for consumers. ERCOT made a significant effort to evaluate the engineering feasibility of the interconnections and circuits that it proposed. Consistent with the PUCT's directive, ERCOT also endeavored to design the transmission plans for each scenario to be staged and expandable to bring more wind generation on-line over time.
For Scenario 1, ERCOT designed two transmission proposals for 12,053 MW of wind generation. Plan A has an estimated cost of $2.95 billion, excluding collection costs, and Plan B, which is a more scalable transmission proposal, has an estimated cost of $3.78 billion. ERCOT recommended Plan B, since it provides for more cost-effective expansion in the future.
For Scenario 2, ERCOT's estimated cost of the transmission proposal for 18,456 MW of wind generation is $4.93 billion, excluding collection costs.
For Scenario 3, ERCOT's estimated cost of the transmission proposal for 24,859 MW of wind generation is $6.38 billion, excluding collection costs.
For Scenario 4, ERCOT's estimated cost of the transmission proposal for 24,419 MW of wind generation is $5.75 billion, excluding collection costs.
Full post as published by Energy Legal Blog on April 21, 2008 (boomark / email).
Dumb Texas Laws
Stupid Laws in the Lone Star State
Selection of State Supreme Court Judges
How State Court Judges are Selected
Texas Employment Law
alleged violations of Texas labor laws including overtime pay, discrimination and harassment.
Gulf War Syndrome
Panel Confirms it's Real, and Identifies Causes
GM
Preliminarily Settles Transmission Class Action for $90 Million
Manasek Auto Parts
allegedly conspiring to fix prices for replacement oil, air, fuel and transmission filters.
Wind and Hail Coverage
Allstate Corp. agrees to restore insurance coverage and pay $250,000 settlement.
Texas' KB Home Hit with Price Fixing Class Action
Texas' KB Home Faces Price Fixing Class-Action

Texas Appeals Court Finds No Merit to Aesthetic Nuisance Claim against Wind Farm
Workers Comp in New Hampshire: A Cold Wind Blows
Betting on Wind Power at the Jersey Shore:
Global Wind Energy Market Survey: US Wind Markets Surge to New Heights