Home -> Law Blog Directory -> Energy Law Blogs -> Energy Legal Blog
(866) 635-2689 for Personal Injury or (866) 635-9402 for Criminal Defense
Find a Local Lawyer
Divorce (866) 635-6190
Personal Injury (866) 635-2689
Criminal Defense (866) 635-9402
Energy Law
: Energy Legal BlogNew Reliability Standards for Cyber Security and Facilities Design Adopted for North American Grid
By Jennifer Rinker
FERC in a January 17 order approved eight new Reliability Standards developed by the North American Electric Reliability Corporation (NERC) regarding Cyber Security (CIP). These approvals come on the heels of FERC's approval last month of three new standards relating to Facilities Design, Connections and Maintenance (FAC). These authorizations mark two more bundles in a long series of standards developed by NERC as the FERC-designated Electric Reliability Organization.
The January 17 FERC-approved Cyber Security standards include CIP-002-1 ? Critical Cyber Asset Identification, CIP-003-1 ? Security Management Controls, CIP-004-1 ? Personnel and Training, CIP-005-1 ? Electronic Security Perimeter(s), CIP-006-1 ? Physical Security of Critical Cyber Assets, CIP-007-1 ? Systems Security Management, CIP-008-1 ? Incident Reporting and Response Planning and CIP-009-1 ? Recovery Plans for Critical Cyber Assets. The standards require "owners and operators of the bulk power system to establish policies, plans and procedures to safeguard physical and electronic access to control systems, to train personnel on security matters, to report security incidents, and to be prepared to recover from a cyber incident."
FERC Chairman Joseph Kelliher indicated that while approving these standards, FERC was also directing NERC to make modifications relating to "reasonable business judgment and acceptance of risk" that "will strengthen the reliability standards . . . and improve [the Nation's] defenses against cyber threats." In addition, FERC directed NERC to examine "a new framework of accountability surrounding exceptions based on technical feasibility" and to monitor the development and implementation of cyber security standards by the National Institute of Standards and Technology.
Last month's approval of three new mandatory standards for Facilities Design, Connections and Maintenance (FAC) require planning authorities and reliability coordinators to establish methodologies to determine system operating limits for the bulk-power system in the planning and operation arenas.
FAC-010-1 requires the planning authority to develop methodology that is "applicable to the planning time horizon, does not exceed facility ratings, and includes a description of how to identify the subset of [System Operating Limits] that qualify as [interconnection reliability operating limits]." FAC-011-1 imposes the same general directives on the reliability coordinator. FAC-014-1 requires reliability coordinators, planning authorities, transmission planners, and transmission operators to "develop and communicate System Operating Limits in accordance with FAC-010-1 and FAC-011-1." In addition, FAC-014-1 requires that System Operating Limits are provided to entities with a reliability-related need.
Full post as published by Energy Legal Blog on January 17, 2008 (boomark / email).
Rightwing Extremism
Current Economic and Political Climate Fueling Resurgence in Radicalization and Recruitment
Law Enforcement and Criminal Justice Career Choices
Descriptions of law enforcement occupations
Department of Homeland Security, FBI, and Social Security Administration
allegedly denied social security insurance to disabled and elderly immigrants.
Lawsuit Filed Against Legacy Health Care Facilities for Nursing Home Abuse
Legacy Health Care Facilities Face Class Action Over Allegations of Abuse
$69M Settlement Approved in Volkswagen, Audi Design Defect Class Action
$69M Settlement Approved in Volkswagen, Audi Design Defect Class Action
Pittsburgh Health Care Facilities
Facing Wages Class Actions
Recovery One, Cyber Asset, Ascension Recovery - Renovo One LLC
REPOSSESSION DRIVERS - UNPAID OVERTIME
Golden Gate National Recreation Area
allegedly failed to provide adequate facilities for the disabled.

Detailed North American Electric Reliability Data - Selected Years
Whats the Cyber in Cyber-Security
Coffee break: Outsmart a cybercrook
DHS Fact Sheet: Cyber Storm II National Cyber Exercise









